<listing id="b1vrb"><cite id="b1vrb"></cite></listing>
<var id="b1vrb"></var>
<ins id="b1vrb"><span id="b1vrb"></span></ins>
<var id="b1vrb"></var>
<var id="b1vrb"><video id="b1vrb"><thead id="b1vrb"></thead></video></var>
<var id="b1vrb"><strike id="b1vrb"><listing id="b1vrb"></listing></strike></var>
<cite id="b1vrb"></cite>
<ins id="b1vrb"><span id="b1vrb"></span></ins>
<thead id="b1vrb"></thead><menuitem id="b1vrb"></menuitem>
<var id="b1vrb"></var>
<var id="b1vrb"></var>
<var id="b1vrb"></var>
<var id="b1vrb"><strike id="b1vrb"></strike></var>
<cite id="b1vrb"><strike id="b1vrb"><listing id="b1vrb"></listing></strike></cite>
<cite id="b1vrb"><video id="b1vrb"></video></cite>
Volume 35 Issue 8
Jul.  2021
Turn off MathJax
Article Contents
WANG Gang, WANG Bin, WANG Bao, WANG Chuang, MU Yan-qing, WANG Bo-lin, LIU Qing, XIE Fei-ming, LI Hong-wei, NIE Xiao-wu, LU Xin-chun. Scheduling model for steelmaking-continuous casting process based on “furnace-caster matching” principle[J]. Chinese Journal of Engineering, 2013, 35(8): 1080-1092. doi: 10.13374/j.issn1001-053x.2013.08.014
Citation: WANG Gang, WANG Bin, WANG Bao, WANG Chuang, MU Yan-qing, WANG Bo-lin, LIU Qing, XIE Fei-ming, LI Hong-wei, NIE Xiao-wu, LU Xin-chun. Scheduling model for steelmaking-continuous casting process based on “furnace-caster matching” principle[J]. Chinese Journal of Engineering, 2013, 35(8): 1080-1092. doi: 10.13374/j.issn1001-053x.2013.08.014

Scheduling model for steelmaking-continuous casting process based on “furnace-caster matching” principle

doi: 10.13374/j.issn1001-053x.2013.08.014
  • Received Date: 2012-10-25
  • Aiming at the steelmaking-continuous casting scheduling problem of a special steel plant, firstly, a multi-objective optimization scheduling model was developed, whose main evaluation indexes are furnace-caster matching degree, continuous casting heats, process waiting time, etc. Then the feasible range of product mix and production modes under different product mix conditions were analyzed by resolving the process flow structure and the operation cycle of steelmaking, refining, and continuous casting process. The scheduling problems under different production modes were solved by adjusting the operation cycle values of flexible processes on the basis of "furnace-caster matching" principle. Finally, the scheduling plans were calculated and compared with actual production data; the simulation results indicate the validity and superiority of the scheduling model and the solution strategy.

     

  • loading
  • 加載中

Catalog

    通訊作者: 陳斌, bchen63@163.com
    • 1. 

      沈陽化工大學材料科學與工程學院 沈陽 110142

    1. 本站搜索
    2. 百度學術搜索
    3. 萬方數據庫搜索
    4. CNKI搜索
    Article views (213) PDF downloads(9) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return
    青青草原综合久久大伊人精品